Documents are PDF (require Acrobat Reader)
I. Project Status
Project Status Update as of 11-12-09
Project Status Update as of 10-8-09
Project Status Update as of 9-24-09
Project Status Update as of 9-9-09
Project Status Update as of 8-27-09
Archived Project Status Updates
II. Construction Activity
Construction Activity Report 2009-10
Construction Activity Report 2008-09
Construction Activity Report 2007-08
Climate Commitment and Draft Greenhouse Gas Emissions Inventory Overview (11-12-09)
Greenhouse Gas Emissions Inventory 2005-08 (Draft) September 2009
Building 100 Remodel Feasibility (11-12-09)
Faculty Offices Feasibility Study (11-6-09)
Chevron Energy Solutions Presentation (11-20-08)
Executive Summary (Soccer & Baseball Feasibility Study) 10-3-08
Instructional Office Building - Design Update as of 11-9-06
Program Definition - Building 1900
Measure B
Measure B Facilities Bond - Update 03-16-06
Measure B Facilities Bond - Update 02-16-06
Master Plans
Chabot College Proposed Facilities Master Plan 04-28-05
Chabot College Proposed Facilities Master Plan 04-28-05 (aerial map)
Chabot College Landscape Plans
Chabot College Draft Master Plan (presented on Flex day 2/23/05): download PDF version (smaller, 16 Mb file) or original PowerPoint version (larger, 58 Mb zip file)